Essential guidelines for routine inspections, filter replacements, and system flushing to keep your water treatment system in top condition
Advanced Ultra-Filtration
UF-7.5 Single
1 Ultra Filtration Membrane + 1 Cartridge With a 7.5 GPM Flow Rate
UF-15 Double Double
2 Ultra Filtration Membranes + 2 Cartridges With a 15 GPM Flow Rate
UF-15 Double
1 Ultra Filtration Membrane + 2 Cartridges With A 15Â GPM Flow Rate
UF-30 Quad
2 Ultra Filtration Membranes + 4 Cartridges With A 30 GPM Flow Rate
Maintenance Points
🔧 Keep your system running smoothly with these key steps:
🔹 Flush as needed – Press FL button if flow drops. 🔹 Replace membranes – If flushing doesn’t restore flow. 🔹 Monitor pressure – Keep below 45 psi; flush if high. 🔹 Sanitize (6-12 months) – Use chlorine solution, flush well. 🔹 Check for leaks (monthly) – Inspect & replace O-rings. 🔹 Inspect valves (quarterly) – Ensure proper sealing.
🔵 Use cold water | 🔵 Flush after filter changes | 🔵 Protect from freezing
BFD- High Flow Cartridges
BFD-Single
1 cartridge, Up to 7.5 GPM flow rate
BFD-Dual
2 cartridges, Up to 15 GPM flow rate
BFD-Quad
4 cartridges, Up to 30 GPM flow rate
Maintenance Guide
🔹 Replace cartridge – When flow drops; twist left to remove, right to install. 🔹 Flush system – Run water 5 min after replacement. 🔹 Check for leaks – Inspect O-rings monthly, replace if worn. 🔹 Monitor pressure – Keep 20-125 psi, check gauge if at 0 psi. 🔹 Inspect rinse valve – Ensure it fully closes every 3 months. 🔹 Sanitize (6-12 months) – Use chlorine solution, flush well.
🚰 Simple steps = Reliable, clean water! 💧
Drinking Water System
Essence Pro-7
 Engineered with innovation in mind, our system boasts several advantages that set it apart from the competition, ensuring you enjoy the purest, healthiest water possible.
LED UV
These filters work by exposing water to a UV lamp, which emits high-frequency ultraviolet light that damages the DNA of microorganisms, preventing them from reproducing and rendering them harmless
Maintenance Guide
🔹 Replace Cartridges – When water flow decreases; twist left to remove, right to install​. 🔹 Flush System – Run water for 5 minutes after cartridge replacement​. 🔹 Check for Leaks – Inspect O-rings monthly; replace if worn​. 🔹 Monitor Pressure – Maintain 20-125 psi; check the gauge if pressure drops to 0 psi​. 🔹 Inspect UV LED – Ensure the LED module functions properly; replace annually for maximum disinfection​. 🔹 Sanitize System – Use chlorine solution every 6-12 months; flush thoroughly after sanitizing​​. 🔹 Check Electrical Safety – Always unplug the UV LED before maintenance; ensure GFCI protection​.
Peak flow rate up to 15 gpm Hardness removal Chlorines, Chloramine remova
TC_13
Peak flow rate up to 22 gpm Hardness removal Chlorines, Chloramine removal
TC_16
Peak flow rate up to 60 gpm Hardness removal Chlorines, Chloramine removal
Maintenance Guide
🔹 Replace Salt – Check salt levels monthly; add salt when below halfway. 🔹 Flush Brine Tank – Clean the tank annually to prevent salt bridging. 🔹 Inspect Resin Tank – Monitor resin beads every 2-3 years; replace if water softening declines. 🔹 Clean Injector and Venturi – Every 6 months, remove and clean to maintain water flow. 🔹 Check for Leaks – Inspect hoses and connections monthly; tighten or replace as needed. 🔹 Monitor Water Pressure – Maintain 20-100 psi; install a pressure regulator if above 80 psi​. 🔹 Sanitize System – Use chlorine solution every 6-12 months; flush thoroughly after sanitizing​.